On Thursday, September 21 the Ferris parking lot adjacent to the Central Energy Plant will be shut down and remain closed until Friday, September 22 at 4:00 PM. This is to allow a crane to setup and install equipment on the south side of the Central Energy Plant. Please note that each morning of this shut down the Ferris Roadway will be one way alternating traffic in this area and vehicles will be directed by a flagger along the roadway for safety.