Ferris Locker Room hallway closed. Follow signage to enter locker rooms through secondary entrances.

The Locker Room hallway in Ferris Athletic Center will be under construction from July 18th until August 9th. The general locker rooms will be accessible through the back entrances. Signage will be posted directing to the secondary locker room entrances.